The following explains how to set up the plunge standard and XL models with a heating component.
Step-by-Step
STEP 1: Location Requirements• Place the Plunge on a flat surface that |
|
STEP 2: Attach the "in" ConnectionScrew on the "In" connection from the water pump to the "In" connector on the chiller. |
|
STEP 3: Fill the Plunge• Attach the included carbon hose filter Recommended water level: Indoor = 4.5" from the top Outdoor = 3" from the top |
|
STEP 4: Attach "Out" ConnectionScrew on the "Out" connection from the water filter on the "Out" connector on the chiller. DO NOT connect the "Out" connection until the Plunge is half full. |
|
STEP 5: Plug in the Plunge• Plug the main power cord from the electrical DO NOT move onto the next step if no water is Note: If you plan to use an extension cord, it needs to be 12 gauge to give the Plunge sufficient power up to 25ft. Please follow all NEC requirements. |
|
STEP 6: Plug in the Chiller
Plug the chiller into the outlet labeled 'COOLING' in the electrical box. |
|
STEP 7: Set TemperatureYou’ll control the temp with the Inkbird WiFi |
|
STEP 8: Operate LightTurn the light on/off via the silver button on |
|
STEP 9: Attach Phone Mount
Install the phone/tablet mount by attaching the two suction cups to the Plunge and rotating each one clockwise until fully secure. |
Comments
0 comments
Article is closed for comments.